Backflow Prevention Assembly Tester — Practice Exam
Test procedure: practice questions
Our Backflow Tester bank has 22 questions on this topic. Here are 5 of them with answers; the full mock exam draws from every topic, like the real one.
Question 1
In a DC test, why is the bleed valve or high-side bleed needle opened briefly after connecting the hose?
- To drain the assembly before the test begins
- To vent air from the hose and gauge
- To raise the supply pressure
- To raise the reading
Show the answer
B. To vent air from the hose and gauge — Remove air for accurate readings.
Question 2
What should be done if a leaking shutoff valve prevents a valid test?
- Record the test as passed, since the checks can't be tested
- Repair the shutoff valve, then test
- Skip the assembly
- Test it with the valve open
Show the answer
B. Repair the shutoff valve, then test — LA County: leaking shutoffs that prevent a test must be repaired.
Question 3
Why is the order of test steps important in a field test?
- Only for paperwork
- Each step relies on conditions set by the previous one, such as a no-flow condition
- To save water
- It doesn't matter, as long as all readings are taken
Show the answer
B. Each step relies on conditions set by the previous one, such as a no-flow condition — Follow the approved procedure exactly.
Question 4
LA County warns against checking for a leaking #1 shutoff valve by doing what?
- Using a sight tube
- Opening a test cock downstream of the second check valve and draining the assembly
- Lowering the pressure upstream of the check valve being tested
- Tapping the check valve body with a wrench
Show the answer
C. Lowering the pressure upstream of the check valve being tested — It could cause backflow.
Question 5
What should a tester do if the assembly fails a test?
- Report the failure, then repair or have it repaired and retest
- Mark it as passed and note the problem for next year
- Mark it as passed and add a note on the report so the problem is checked next year
- Remove it
Show the answer
A. Report the failure, then repair or have it repaired and retest — Defective parts must be repaired and retested.