Program management: practice questions

Our ISA Utility Specialist bank has 42 questions on this topic. Here are 5 of them with answers; the full mock exam draws from every topic, like the real one.

Start the free mock exam

Question 1

Why does the FERC report say UVM schedules should be flexible?

  1. Precipitation, drought and pests change growth and workload unpredictably
  2. Crews prefer varied work, and regulators require schedules to change each year
  3. Regulators require random schedules
  4. Trees grow the same every year
Show the answer

A. Precipitation, drought and pests change growth and workload unpredictably — The intent is to manage vegetation before it threatens reliability.

Question 2

Under FAC-003-5, what must happen when work is blocked (for example by a court order) and encroachment could result?

  1. The owner takes corrective action to keep vegetation out of the MVCD
  2. Nothing until the constraint ends, since the owner is not responsible
  3. The landowner is fined
Show the answer

A. The owner takes corrective action to keep vegetation out of the MVCD — Requirement R5; evidence may include increased monitoring or de-rating the line.

Question 3

Which industry cycle range does the FERC report give?

  1. From 1 to 10+ years
  2. Always 3 years exactly, as required by NERC
  3. 50 to 100 years
  4. Monthly
Show the answer

A. From 1 to 10+ years — Cycle length depends on many uncontrollable influences.

Question 4

Which resource assessment tools does the Utility Specialist outline name?

  1. Increment borers and soil probes used on every tree
  2. GPS/GIS data collection and aerial patrols
  3. Customer billing records
  4. Customer billing amounts and payment histories for each circuit
Show the answer

B. GPS/GIS data collection and aerial patrols — The FERC report adds that aerial patrols should be checked by ground patrols where clearance is uncertain.

Question 5

What does the FERC report say about utility quality assurance in UVM?

  1. QA is unnecessary if contractors are paid by the hour
  2. Only customers should check work
  3. QA should be built into work practices, not limited to post-audits
  4. QA is unnecessary when contractors are paid by the hour
Show the answer

C. QA should be built into work practices, not limited to post-audits — Quality control belongs in field practices with QA oversight.