semplr.

Exams · Certifications · Licensing

NABCEP PV Associate (PVA) — Practice Exam

Safety: material handling: practice questions

Our NABCEP PV Associate bank has 4 questions on this topic. Here are 4 of them with answers; the full mock exam draws from every topic, like the real one.

Start the free mock exam

Question 1

Why should tools be tethered when working on a roof?

  1. To keep dropped tools from striking people below
  2. Tethering is only required for batteries
  3. To make the tools easier to charge
  4. To keep tools from rusting by holding them off the wet roof surface between uses
Show the answer

A. To keep dropped tools from striking people below — Tool tethering is an equipment-handling control for work at height.

Question 2

Why is wind a special hazard when carrying PV modules on a roof?

  1. Wind cools the modules too much
  2. It is only a hazard at night
  3. Modules act like sails and can pull a worker off balance
  4. Wind makes the modules heavier, so each worker can safely carry only one at a time
Show the answer

C. Modules act like sails and can pull a worker off balance — Avoid carrying modules in high wind and use two people or a hoist.

Question 3

What is the safest way to lift a heavy inverter onto a wall mount?

  1. Use mechanical aids or two people and lift with the legs, keeping the back straight
  2. Bend at the waist and lift alone quickly
  3. Carry it overhead
  4. Twist while lifting to save time
Show the answer

A. Use mechanical aids or two people and lift with the legs, keeping the back straight — Ergonomic lifting prevents back injuries.

Question 4

Why should PV modules be staged across the roof rather than stacked in one spot?

  1. To spread the load and avoid overloading the roof structure
  2. It makes the modules produce more power
  3. Stacking modules in one place voids the module warranty in every case, regardless of the roof type
  4. Stacking voids the module warranty in every case
Show the answer

A. To spread the load and avoid overloading the roof structure — Equipment staging and roof load distribution are part of the safety plan.

More NABCEP PV Associate topics