semplr.

Exams · Certifications · Licensing

OSHA 30-Hour Construction Outreach (knowledge check)

Focus Four: caught-in or between: practice questions

Our OSHA 30 Construction bank has 22 questions on this topic. Here are 5 of them with answers; the full mock exam draws from every topic, like the real one.

Start the free mock exam

Question 1

Who must inspect excavations, and when?

  1. An engineer, once a week, with a written report sent to OSHA
  2. The equipment operator, at the end of the day
  3. A competent person, daily before work and as needed during the shift
  4. OSHA, before the excavation opens, and again whenever the trench is made deeper
Show the answer

C. A competent person, daily before work and as needed during the shift — Daily inspections of excavations, adjacent areas and protective systems must be made by a competent person before work and as needed, including after rainstorms.

Question 2

What is the maximum allowable slope for a simple slope excavation 20 feet or less deep in Type C soil?

  1. 3/4:1
  2. 1:1, the same as Type B soil
  3. 1 1/2:1
  4. 1/2:1
Show the answer

C. 1 1/2:1 — In Type C soil, all simple slope excavations 20 feet or less deep must have a maximum allowable slope of 1 1/2:1.

Question 3

What oxygen level makes an excavation atmosphere oxygen deficient?

  1. Less than 21 percent
  2. Less than 16 percent
  3. Less than 19.5 percent
  4. More than 23.5 percent
Show the answer

C. Less than 19.5 percent — Where oxygen deficiency (less than 19.5 percent) or a hazardous atmosphere could exist, the atmosphere must be tested before employees enter excavations deeper than 4 feet.

Question 4

How far back from the edge of an excavation must spoil piles and equipment be kept?

  1. At least 6 inches
  2. At least 10 feet
  3. At least 2 feet
  4. At least 25 feet
Show the answer

C. At least 2 feet — Materials and equipment must be kept at least 2 feet from the edge of excavations, or retaining devices must be used.

Question 5

What is the maximum allowable slope for a simple slope excavation 20 feet or less deep in Type A soil?

  1. 1:1 (horizontal to vertical), the same as Type B soil
  2. 3/4:1 (horizontal to vertical)
  3. 1 1/2:1
  4. 1/2:1 for any depth
Show the answer

B. 3/4:1 (horizontal to vertical) — Appendix B allows 3/4:1 in Type A soil, 1:1 in Type B and 1 1/2:1 in Type C for simple slope excavations 20 feet or less deep.