OSHA 30-Hour Construction Outreach (knowledge check)
Focus Four: caught-in or between: practice questions
Our OSHA 30 Construction bank has 22 questions on this topic. Here are 5 of them with answers; the full mock exam draws from every topic, like the real one.
Question 1
Who must inspect excavations, and when?
- An engineer, once a week, with a written report sent to OSHA
- The equipment operator, at the end of the day
- A competent person, daily before work and as needed during the shift
- OSHA, before the excavation opens, and again whenever the trench is made deeper
Show the answer
C. A competent person, daily before work and as needed during the shift — Daily inspections of excavations, adjacent areas and protective systems must be made by a competent person before work and as needed, including after rainstorms.
Question 2
What is the maximum allowable slope for a simple slope excavation 20 feet or less deep in Type C soil?
- 3/4:1
- 1:1, the same as Type B soil
- 1 1/2:1
- 1/2:1
Show the answer
C. 1 1/2:1 — In Type C soil, all simple slope excavations 20 feet or less deep must have a maximum allowable slope of 1 1/2:1.
Question 3
What oxygen level makes an excavation atmosphere oxygen deficient?
- Less than 21 percent
- Less than 16 percent
- Less than 19.5 percent
- More than 23.5 percent
Show the answer
C. Less than 19.5 percent — Where oxygen deficiency (less than 19.5 percent) or a hazardous atmosphere could exist, the atmosphere must be tested before employees enter excavations deeper than 4 feet.
Question 4
How far back from the edge of an excavation must spoil piles and equipment be kept?
- At least 6 inches
- At least 10 feet
- At least 2 feet
- At least 25 feet
Show the answer
C. At least 2 feet — Materials and equipment must be kept at least 2 feet from the edge of excavations, or retaining devices must be used.
Question 5
What is the maximum allowable slope for a simple slope excavation 20 feet or less deep in Type A soil?
- 1:1 (horizontal to vertical), the same as Type B soil
- 3/4:1 (horizontal to vertical)
- 1 1/2:1
- 1/2:1 for any depth
Show the answer
B. 3/4:1 (horizontal to vertical) — Appendix B allows 3/4:1 in Type A soil, 1:1 in Type B and 1 1/2:1 in Type C for simple slope excavations 20 feet or less deep.