Question 1

Kitchen base cabinets are installed level by starting from:

  1. The middle of the wall
  2. The ceiling down
  3. The highest point of the floor
  4. The lowest point of the floor, then shimmed up to the top line
Show the answer

C. The highest point of the floor — Starting at the high point lets you shim up elsewhere instead of cutting cabinets down.

Question 2

The horizontal distance from the face of one riser to the face of the next is the:

  1. Rise
  2. Run
  3. Nosing
  4. Headroom
Show the answer

B. Run — Run is measured horizontally between riser faces; rise is the vertical height.

Question 3

To join two pieces of baseboard on a long straight wall, a carpenter uses a:

  1. Mortise and tenon
  2. Coped joint
  3. Dado joint
  4. Scarf joint
Show the answer

D. Scarf joint — Angled scarf joints hide the seam better than a butt joint.

Question 4

Type X drywall is used where:

  1. A fire-resistance rating is required
  2. Sound control is not a concern
  3. The ceiling is very low
  4. The wall will be tiled in a shower
Show the answer

A. A fire-resistance rating is required — Type X gypsum board has additives that improve fire resistance.

Question 5

Why are butt (end) joints in drywall staggered?

  1. To use more drywall
  2. To meet the fire code in every type of building, not for appearance
  3. To avoid lining up joints, which can crack and show
  4. To make taping faster
Show the answer

C. To avoid lining up joints, which can crack and show — Staggered end joints spread stress and are less visible.