G. Renovations: practice questions

Our Red Seal Carpenter bank has 20 questions on this topic. Here are 5 of them with answers; the full mock exam draws from every topic, like the real one.

Start the free mock exam

Question 1

When adding a new floor to existing framing, the new subfloor should be:

  1. Higher than the old floor to show the addition
  2. Aligned flush with the existing floor surface
  3. Unfastened to allow movement
  4. Laid on the old roof
Show the answer

B. Aligned flush with the existing floor surface — New construction must meet the old at matching elevations.

Question 2

Before removing part of a floor system to add a stair opening, the joists to be cut must be:

  1. Left hanging until the inspection so the inspector can see the original framing
  2. Glued together
  3. Supported temporarily and then carried by new headers and trimmers
  4. Cut without support
Show the answer

C. Supported temporarily and then carried by new headers and trimmers — The cut joists must be supported so the floor does not drop.

Question 3

Suspected asbestos-containing material is found during demolition. The carpenter should:

  1. Stop work in that area and report it so it can be tested and handled properly
  2. Break it up quickly and bag it
  3. Cover it with new drywall and continue work so that the fibres stay sealed in
  4. Sweep it with a dry broom
Show the answer

A. Stop work in that area and report it so it can be tested and handled properly — Disturbing asbestos releases fibres; work stops until it is assessed and abated by qualified workers.

Question 4

Dry sanding or heat-stripping old paint in an older house is hazardous mainly because the paint may contain:

  1. Formaldehyde
  2. Lead
  3. Radon
  4. Silica
Show the answer

B. Lead — Older paints often contain lead; sanding and burning release lead dust and fumes. Hazardous materials must be identified before renovation work (RSOS G-21).

Question 5

Sistering a joist means:

  1. Fastening a new joist alongside a damaged or weak one
  2. Cutting a joist in half
  3. Removing every other joist
  4. Installing bridging only
Show the answer

A. Fastening a new joist alongside a damaged or weak one — The new member shares load with the old one.