semplr.

Exams · Certifications · Licensing

EPA Lead Renovation, Repair and Painting (RRP) Certified Renovator course test

Rules and applicability: practice questions

Our EPA Lead RRP Renovator bank has 69 questions on this topic. Here are 5 of them with answers; the full mock exam draws from every topic, like the real one.

Start the free mock exam

Question 1

The Pre-Renovation Education Rule (pamphlet delivery) has been in effect since:

  1. June 1999
  2. April 2010
  3. January 1978
  4. December 2015
Show the answer

A. June 1999 — Section 745.81(c) states the Pre-Renovation Education Rule provisions have been in effect since June 1999.

Question 2

Which project counts as a renovation under the RRP definition?

  1. Installing a new appliance without disturbing paint
  2. Cutting into painted walls to blow in insulation
  3. Washing walls with a sponge
  4. Moving furniture between rooms
Show the answer

B. Cutting into painted walls to blow in insulation — The definition lists weatherization such as cutting holes in painted surfaces to install blown-in insulation.

Question 3

What is the 'dripline' around a building?

  1. The roof gutter and the downspouts that drain it
  2. The area directly under the eaves and nowhere else
  3. The area within 10 feet of the building's perimeter
  4. The area within 3 feet of the building's perimeter
Show the answer

D. The area within 3 feet of the building's perimeter — Section 745.63 defines the dripline as the area within 3 feet surrounding the perimeter of a building.

Question 4

What is the 'window trough'?

  1. The interior window stool that sticks into the room
  2. The exterior sill area between sill and storm window
  3. The top rail of the window frame above the sash
  4. The glass pane and the glazing putty around it
Show the answer

B. The exterior sill area between sill and storm window — Section 745.63 defines the trough as the part of the exterior sill between the interior sill and the storm window frame, or where both sashes rest.

Question 5

Since January 12, 2026, what is the dust-lead action level for window troughs?

  1. 100 µg/ft²
  2. 5 µg/ft²
  3. 40 µg/ft²
  4. 400 µg/ft²
Show the answer

A. 100 µg/ft² — Window troughs have an action level of 100 µg/ft² from January 12, 2026 (it was 400 before).

More EPA Lead RRP Renovator topics