Water & Wastewater Operator (WPI/ABC Class I) — Practice Exam
WC lift stations: practice questions
Our Water/Wastewater Operator bank has 17 questions on this topic. Here are 5 of them with answers; the full mock exam draws from every topic, like the real one.
Question 1 · Wastewater Collection Class I
Under the Ten States Standards, what conditions must trigger a pumping station alarm?
- Power failure, high wet well level, pump failure, unauthorized entry or other malfunction
- Only fire inside the station building
- Only a fire inside the station building, since other problems can wait for the next scheduled visit
- Only scheduled maintenance
Show the answer
A. Power failure, high wet well level, pump failure, unauthorized entry or other malfunction — Ten States Standards 46.
Question 2 · Wastewater Collection Class I
What four types of wastewater pumping stations do the Ten States Standards list?
- Wet well/dry well, submersible, suction lift and screw pump
- Peristaltic, diaphragm, gear and airlift pumping stations used for raw sewage
- Centrifugal, peristaltic, diaphragm and gear
- Only submersible
Show the answer
A. Wet well/dry well, submersible, suction lift and screw pump — Ten States Standards 42.1.
Question 3 · Wastewater Collection Class I
What does a lift station do?
- Treats wastewater with chemicals before it reaches the plant, so the plant can be smaller
- Removes grit only
- Treats wastewater before it reaches the plant
- Pumps wastewater from a lower elevation to a higher one so it can continue by gravity
Show the answer
D. Pumps wastewater from a lower elevation to a higher one so it can continue by gravity — Common in flat or hilly areas.
Question 4 · Wastewater Collection Class I
Why should wet wells be cleaned periodically?
- It isn't necessary
- Grease, grit and debris build up and interfere with pumps and level controls
- For appearance and to lower the amount of inflow reaching the station from the sewer
- For appearance and to lower inflow
Show the answer
B. Grease, grit and debris build up and interfere with pumps and level controls — Clean and maintain tanks.
Question 5 · Wastewater Collection Class I
What is the main goal of emergency operation planning for lift stations?
- Lowering power bills during peak hours and reducing pump wear
- Increasing flow
- Preventing raw wastewater discharges and basement backups
- Reducing pump maintenance
Show the answer
C. Preventing raw wastewater discharges and basement backups — Ten States Standards 47.1.
More Water/Wastewater Operator topics
- WT treatment: coagulation
- WT treatment: filtration
- WT treatment: disinfection
- WT treatment: operation
- WT math
- WT lab
- WT equipment
- WT source water
- WT safety
- WT admin
- WW secondary: activated sludge
- WW secondary: fixed film
- WW solids
- WW effluent
- WW equipment: aeration
- WW equipment: pumps
- WW equipment: instruments
- WW lab
- WW safety
- WW process
- WD components: mains
- WD components: valves
- WD components: hydrants
- WD components: storage
- WD components: meters
- WD equipment: installation
- WD equipment: repair
- WD equipment: maintenance
- WD quality
- WD admin
- WC system
- WC O&M
- WC monitoring
- WC safety