Water & Wastewater Operator (WPI/ABC Class I) — Practice Exam
WT equipment: practice questions
Our Water/Wastewater Operator bank has 20 questions on this topic. Here are 5 of them with answers; the full mock exam draws from every topic, like the real one.
Question 1 · Water Treatment Class I
Why is preventive maintenance done on plant equipment?
- To reduce breakdowns and extend equipment life
- To use more lubricants and spare parts each year
- Only after equipment fails, so parts aren't replaced before they wear out
- To meet the state's billing rules
Show the answer
A. To reduce breakdowns and extend equipment life — PM is scheduled based on manufacturer guidance.
Question 2 · Water Treatment Class I
What does a motor running hot with a burning smell suggest?
- Normal operation for a new motor; it needs a higher voltage supply to run cooler
- It needs to run faster
- Overload, poor ventilation or bearing problems; shut it down and investigate
- Normal operation; it needs more voltage to run faster
Show the answer
C. Overload, poor ventilation or bearing problems; shut it down and investigate — Check amps, cooling and bearings.
Question 3 · Water Treatment Class I
How is a small chlorine gas leak located?
- With a lit match held near each fitting until the flame changes color
- With water spray
- With a soap solution only
- With ammonia vapor, which forms a white cloud at the leak
Show the answer
D. With ammonia vapor, which forms a white cloud at the leak — Never put water on a chlorine leak.
Question 4 · Water Treatment Class I
Why should water never be sprayed on a leaking chlorine cylinder?
- Water forms acid that makes the leak worse
- It is the recommended first step
- It dilutes the chlorine so the gas becomes harmless
- It cools the cylinder too much and freezes the valve shut
Show the answer
A. Water forms acid that makes the leak worse — Corrosion enlarges the leak.
Question 5 · Water Treatment Class I
What does a magnetic flowmeter measure?
- Turbidity
- Chlorine residual
- Flow rate, from the voltage induced by water moving through a magnetic field
- Pressure in the pipe, using a spring-loaded diaphragm and a dial gauge
Show the answer
C. Flow rate, from the voltage induced by water moving through a magnetic field — It has no moving parts in the flow.
More Water/Wastewater Operator topics
- WT treatment: coagulation
- WT treatment: filtration
- WT treatment: disinfection
- WT treatment: operation
- WT math
- WT lab
- WT source water
- WT safety
- WT admin
- WW secondary: activated sludge
- WW secondary: fixed film
- WW solids
- WW effluent
- WW equipment: aeration
- WW equipment: pumps
- WW equipment: instruments
- WW lab
- WW safety
- WW process
- WD components: mains
- WD components: valves
- WD components: hydrants
- WD components: storage
- WD components: meters
- WD equipment: installation
- WD equipment: repair
- WD equipment: maintenance
- WD quality
- WD admin
- WC system
- WC O&M
- WC lift stations
- WC monitoring
- WC safety